Drilling operations were initiated on September 8 of this year by "Uzneftgaz Drilling Operations," and the well has been drilled to a depth of 4,940 meters. Currently, for three days, the natural properties of the well's productive formation have been under study.
Through these investigations, the well's daily flow rate, formation pressure, and other parameters are being determined.
Furthermore, drilling and testing operations are continuing at two other wells in the Moynaq field. Results from these wells are also expected in the coming days.






